Image from Google Jackets

Change of work order as a delay factor: A case study of building construction in Kelantan, Malaysia/ Ammar Azmi.

By: Contributor(s): Material type: TextTextPublication details: Kelantan: Universiti Malaysia Kelantan, 2015.Description: vii,28p. : ill. ; 30pOther title:
  • Tesis MBA
Subject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Supervisor: Dr. Razli Che Razak.

Includes bibliographical references and index.

There are no comments on this title.

to post a comment.

©2025 Pustaka Universiti Malaysia Kelantan

THE OFFICE OF LIBRARY AND KNOWLEDGE MANAGEMENT