How to implement lean manufacturing / Lonnie Wilson.
Material type:
- 0071625070
- 9780071625074
Item type | Current library | Home library | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|---|---|
![]() |
UMK Kampus Kota | UMK Kampus Kota | DEFAULT | Kampus Kota Open Shelf | TS157 .W57 2010 OS (Browse shelf(Opens below)) | 1 | Damaged | 10023538 |
Browsing UMK Kampus Kota shelves, Shelving location: Kampus Kota Open Shelf, Collection: DEFAULT Close shelf browser (Hides shelf browser)
TS157 .H37 2008 Lean connections : making information flow efficiently and effectively / | TS157 .L36 2010 OS Production and inventory management with substitutions / | TS157 .W57 2010 How to implement lean manufacturing / | TS157 .W57 2010 OS How to implement lean manufacturing / | TS157.4 .H57 2009 JIT implementation manual : the complete guide to just-in-time manufacturing / | TS157.4 .H57 2009 JIT implementation manual : the complete guide to just-in-time manufacturing / | TS157.4 .H57 2009 JIT implementation manual : the complete guide to just-in-time manufacturing / |
Includes bibliographical references and index.
There are no comments on this title.
Log in to your account to post a comment.